A membrane is only as good as the seams that hold it together and the way it is secured to the roof deck. ElvaFlex™ installations are built around two core technical elements: a consistent seaming method, and a choice of attachment systems selected according to deck type, wind exposure, and site conditions – all supported by rigorous detailing and quality control.
Every ElvaFlex™ seam is joined using automated hot-air welding equipment (typically Leister machines).
This process fuses adjoining sheets into a seamless, homogeneous bond with high shear strength. The seam becomes as strong as the membrane itself, rather than a weaker joint between two separate pieces.
Because the process uses hot air instead of an open flame, it eliminates the fire hazard associated with traditional torch-applied systems – a significant advantage on active industrial sites.
Hot-air welding is used on virtually every ElvaFlex™ project, regardless of the attachment method chosen.
Mechanical Attachment For roofs exposed to significant wind uplift – coastal sites, open-terrain buildings, or large unobstructed spans – the membrane is mechanically fastened directly into the structural deck (metal, concrete, or timber).
Fastener spacing and layout are calculated specifically for the building’s wind-load requirements. The membrane’s dimensional stability (≤ 0.8%) helps the system remain secure through thermal cycling without excessive stress on the fixation points.
Fully Adhered Systems Where mechanical fasteners are less suitable due to deck type, architectural constraints, or aesthetic preferences, a fully adhered installation is used.
This approach delivers a uniform finish and good resistance to structural movement. ElvaFlex™ membranes do not require relaxation time before application, allowing continuous installation across varying weather conditions.
In some projects, a hybrid approach may be used – combining mechanical attachment in high-wind zones with adhered areas elsewhere.
Most roof failures occur at the details, not in the middle of the field membrane.
ElvaFlex™ systems use prefabricated accessories for corners, pipe penetrations, and drains. These factory-made components are designed to weld cleanly into the surrounding membrane, reducing reliance on improvised field detailing.
Every seam is inspected as part of the installation process. This disciplined quality control is a key reason the system can support a 20-year no-maintenance warranty.
is possible with specialized penetration detailing.
is commonly done without full tear-off, using mechanical attachment.
is possible with specialized penetration detailing.
is commonly done without full tear-off, using mechanical attachment.
No. Hot-air welding and mechanical attachment are designed for active industrial sites and can usually be carried out without interrupting daily operations.
In most refurbishment cases, yes. The membrane can be mechanically attached directly over existing bitumen or aging metal roofing, avoiding the cost, mess, and downtime of a full tear-off.
The decision depends mainly on deck type, wind-load exposure, and site-specific constraints. Our technical team evaluates these factors and recommends the most suitable attachment method.
Yes. Hot-air welding is the standard seaming method on virtually all ElvaFlex™ installations, whether the membrane is mechanically attached or fully adhered.
Yes. Specialized detailing allows the membrane to be installed beneath existing PV arrays. This requires careful sealing around mounting points and penetrations.
No. Unlike some membranes, ElvaFlex™ does not require relaxation time before application, which helps speed up installation.
Prefabricated accessories are used for these transition points. These factory-made components are designed to weld cleanly into the surrounding membrane, reducing reliance on field improvisation.
Yes. Seam inspection is part of the standard installation process and forms part of the documentation required to issue the 20-year warranty.